摘    要:为了解决九里山矿沿空掘巷巷道支护压力大、变形量大、支护困难、维修工程量大的问题,基于切顶卸压原理和定向预裂爆破技术,结合九里山矿15091回风巷顶板岩层情况,确定了预裂爆破的深度,采用了双缝定向预裂管有效控制爆破产生裂隙的方向,实现了定向爆破。制定了切顶沿空掘巷施工方案,确定了定向预裂爆破参数及沿空掘巷巷道支护形式与参数,并通过矿压观测,对沿空掘巷成巷效果进行了评价。研究结果表明:采用定向预裂切顶爆破后,成巷不稳定时间由30 d缩短到20 d,短时间内巷道进入稳定期;沿空掘巷巷道两帮移近量最大为326 mm,较未切顶巷道减少了112 mm;顶板最大移近量为135 mm,较未切顶巷道减少了80 mm,巷道变形量明显减少,巷道维修量也大幅减少,取得了较好的经济效果。

关 键 词:定向预裂  沿空掘巷  切顶爆破  矿压观测  切顶卸压

 Application study on driving along gob technology with directional pre-splitting and roof-cutting
Ma Lehui.  Application study on driving along gob technology with directional pre-splitting and roof-cutting[J]. Zhongzhou Coal, 2019, 0(6): 154-158. DOI: 10.19389/j.cnki.1003-0506.2019.06.033
Authors:Ma Lehui
Affiliation:(Jiulishan Coal Mine of Jiaozuo Coal Company,Henan Energy Chemical Industry Group Co.,Ltd.,Jiaozuo 454100,China)
Abstract:In order to solve the problems of large support pressure,large deformation,difficulty in support and large amount of maintenance work in the gob-side driving roadway of Jiulishan Mine,the depth of pre-splitting blasting is determined based on the principle of roof cutting and pressure relief and directional pre-splitting blasting technology,combined with the roof strata of 15091 return air roadway in Jiulishan Mine,and the direction of cracks produced by blasting is effectively controlled by double-slit directional pre-splitting pipe,thus realizing orientation blast.Therefore,the construction scheme of gob-side roadway with cutting roof is formulated,the parameters of directional pre-splitting blasting and the supporting forms and parameters of gob-side roadway are determined,and the effect of gob-side roadway is evaluated through rock pressure observation.The results show that after adopting directional pre-splitting roof-cutting blasting,the instability time of roadway is reduced from 30 days to 20 days,and the roadway enters a stable period in a short time;the maximum approximation of two sides of roadway along goaf is 326 mm,which is 112 mm less than that of roadway without roof-cutting;the maximum approximation of roof is 135 mm,which is 80 mm less than that of roadway without roof-cutting;the deformation of roadway is obviously reduced,and the maintenance of roadway is also greatly reduced,the technology has achieved good economic results.
Keywords:  directional presplitting   roadway driving along goaf   roof cutting blasting   rock pressure observation   cutting roof pressure relief
本文献已被 CNKI 等数据库收录!
点击此处可从《中州煤炭》浏览原始摘要信息
点击此处可从《中州煤炭》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号