首页 | 本学科首页   官方微博 | 高级检索  
     

三软煤层半煤岩巷道复合顶板支护技术
引用本文:黄 侨. 三软煤层半煤岩巷道复合顶板支护技术[J]. 中州煤炭, 2019, 0(1): 140-142,147. DOI: 10.19389/j.cnki.1003-0506.2019.01.030
作者姓名:黄 侨
作者单位:(中煤科工集团武汉设计研究院,湖北 武汉 430000)
摘    要:为阻止复合顶板离层下沉,采用数值模拟手段,确定了锚杆间排距均为900 mm的锚网索联合支护方案。通过现场工业实践可知:巷道顶底板最大移近量为176.2 mm,两帮最大移近量96.5 mm,两帮变形速率最大为2.7 mm/d,顶底板变形速率最大4.3 mm/d,顶板没有出现明显的离层,顶板表面没有出现大的裂隙,顶板的完整性较好。

关 键 词:复合顶板  联合支护  数值模拟  矿压观测

 Composite roof support technology for semi-coal and rock roadway in Three Soft coal seam
Huang Qiao.  Composite roof support technology for semi-coal and rock roadway in Three Soft coal seam[J]. Zhongzhou Coal, 2019, 0(1): 140-142,147. DOI: 10.19389/j.cnki.1003-0506.2019.01.030
Authors:Huang Qiao
Affiliation:(Wuhan Design and Research Institute of China Coal Technology & Engineering Group,Wuhan 430000,China)
Abstract:In order to prevent sinking of the composite roof abscission,the numerical simulation method was used which determine the supporting scheme of the combined bolting and cable support method,spacing of bolts of the supporting scheme was 900 mm.Through the industrial practice,we know that the tunnel roof and floor maximum was 176.2 mm,left and right sides of the roadway was 96.5 mm,the largest amount closer of the left and right sides was 2.7 mm/d,roof and floor deformation rate maximum was 4.3 mm/d,the obvious abscission layer roof and the big fissure of the roof did not appear,the integrity of the roof was good.
Keywords:  semi-coal roadway   combined support   numerical simulation   mine pressure observation
本文献已被 CNKI 等数据库收录!
点击此处可从《中州煤炭》浏览原始摘要信息
点击此处可从《中州煤炭》下载免费的PDF全文