首页 | 本学科首页   官方微博 | 高级检索  
     

某钒铁矿分区协同开采方案优化
引用本文:孙会熙,吴爱祥,张磊,王建栋,王雷鸣.某钒铁矿分区协同开采方案优化[J].金属矿山,2016,45(9):30-34.
作者姓名:孙会熙  吴爱祥  张磊  王建栋  王雷鸣
作者单位:1.北京科技大学土木与环境工程学院,北京 100083;2.金属矿山高效开采与安全教育部重点实验室,北京 100083
基金项目:国家自然科学基金项目(51374034;51374035),“十二五”国家科技支撑计划项目((2012BAB08B02)。)
摘    要:针对某钒铁矿资源开采规划不明确,钒铁矿开采相互制约,矿量积压严重,采空区影响矿山安全生产的问题,提出了钒铁矿分区协同开采优化方案。方案将勘探线7#~10#线划为东区,10#~15#线划为中区,15#~21#线划为西区,采用不同的采矿方法进行分区设计与分区回采。新方案设计开采资源储量相比原方案增加了1 064.7万t,提高设计采出矿量约20%;东区增加了矿石回收率9个百分点,中区增加了21个百分点,西区增加了14个百分点,使矿产资源得到了充分有效回收,经济效益得到了显著提高;同时,消除了采空区危害,改善了铁矿上盘钒矿的开采安全条件,有效保障了安全生产条件。成果对于类似矿山具有重要借鉴意义。

关 键 词:矿量积压  采空区危害  协同开采  经济安全  

Optimization of Mining Scheme on the Partitioning Collaborative Mining of a Vanadium and Iron Mine
Sun Huixi,Wu Aixiang,Zhang Lei,Wang Jiandong,Wang Leiming.Optimization of Mining Scheme on the Partitioning Collaborative Mining of a Vanadium and Iron Mine[J].Metal Mine,2016,45(9):30-34.
Authors:Sun Huixi  Wu Aixiang  Zhang Lei  Wang Jiandong  Wang Leiming
Affiliation:1.School of Civil and Environmental Engineering,University of Science and Technology Beijing,Beijing 100083,China;2.State Key Laboratory of the Ministry of Education for High-efficient Mining and Safety of Metal Mines,Beijing 100083,China
Abstract:Due to the problems of a vanadium and iron mine such as unclear resource mining plan,mutual restriction of mining,serious ore backlog and goaf affecting mine safety production, the collaborative optimization mining scheme is pro-posed. The mining area is divided in to eastern area (7# ~10# prospecting line),central area (10# ~15# prospecting line) and western area (15# ~21# prospecting line ),different mining methods are used for partitioning design and partitioning mining. Compared to the original mining scheme,the reserves is increased by 10. 674 million t and amount of ores is improved 20%, the ore recovery of the eastern area is increased by 9%,the ore recovery of the central area is increased by 21%,the ore recov-ery of the western area is increased by 14%,the mineral resources of the mine is used fully,the economic efficiency is im-proved significantly. Besides that,the goaf hazard is eliminated,the mining safety condition of the vanadium ore upper the iron ore are improved,the safety production conditions of the vanadium and iron mine is guaranteed,the the collaborative optimiza-tion mining scheme proposed in the paper can provide reference for the similar mine.
Keywords:Ore backlog  Goaf hazard  Cooperative mining  Economic security
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《金属矿山》浏览原始摘要信息
点击此处可从《金属矿山》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号