首页 | 本学科首页   官方微博 | 高级检索  
     

四川建设抽水蓄能电站的必要性浅析
引用本文:王尊相.四川建设抽水蓄能电站的必要性浅析[J].四川水力发电,1997,16(2):1-4.
作者姓名:王尊相
摘    要:本文以四川电网近几年运行实际统计,分析阐明随着国民经济和社会发展,人民生活的不断改善,必须带来电网负荷率逐渐降低,峰谷差越来越大的客观规律性,只有建设机动灵活的抽水蓄能电站,才能充分利用水能资源,提高电网供电可靠性,从而获得电网和社会巨大的效益。

关 键 词:峰谷差  负荷率  抽水蓄能水电站  水电站  四川

Preliminary Analysis on the Neccessity of Construction Pumped Storage Hydroplant in Sichuan
Wang Zunxiang.Preliminary Analysis on the Neccessity of Construction Pumped Storage Hydroplant in Sichuan[J].Sichuan Water Power,1997,16(2):1-4.
Authors:Wang Zunxiang
Affiliation:Sichuan Society of Hydroelectric Engineering
Abstract:According to actual statistics for recent operation of Sichuan Power network,this paper analyses and states the objective law that load ratio in network decreases gradually and difference of peak and valley loads increase with the increase of national economy development of society and improvement of people's living standards Hydropower potential can be fully utilized and reliability of network power supply can be improved by constructing pumlped storage hydroplant. Therefore,great benifit will be gained by network.
Keywords:national economy load ration difference of peak and valley loads pumped storage
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号