首页 | 本学科首页   官方微博 | 高级检索  
     

三汊矶湘江大桥预应力混凝土箱梁顶推施工
引用本文:谭安杨.三汊矶湘江大桥预应力混凝土箱梁顶推施工[J].山西建筑,2010,36(15):317-318.
作者姓名:谭安杨
作者单位:中铁大桥局集团第五桥梁工程公司,湖南,长沙,410008
摘    要:结合工程实例,分析介绍了长沙市三汊矶湘江大桥东岸边孔预应力混凝土箱梁顶推施工技术方案,从临时设施、梁段顶推、施工监测三方面对顶推施工技术及质量控制措施进行了详细阐述,以指导实践。

关 键 词:桥梁施工  箱梁顶推  施工技术

The prestressed concrete box beam incremental launching construction of Sanchaji Xiangjiang Bridge
TAN An-yang.The prestressed concrete box beam incremental launching construction of Sanchaji Xiangjiang Bridge[J].Shanxi Architecture,2010,36(15):317-318.
Authors:TAN An-yang
Affiliation:TAN An-yang
Abstract:Combined with engineering example,the east bank pore prestressed concrete box beam incremental launching construction technical program of Sanchaji Xiangjiang Bridge was analyzed and introduced,it was detail illustrated from temporary facility,beam incremental launching and construction monitoring so as to guide practice.
Keywords:bridge construction  box beam incremental launching  construction technique  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号