首页 | 本学科首页   官方微博 | 高级检索  
     

东升水电站导流墙固结灌浆施工工艺
引用本文:刘卫卫,姜鹏飞,纪晓宇,孙友宏,高井贤. 东升水电站导流墙固结灌浆施工工艺[J]. 探矿工程(岩土钻掘工程), 2012, 39(9): 71-74
作者姓名:刘卫卫  姜鹏飞  纪晓宇  孙友宏  高井贤
作者单位:吉林大学建设工程学院,吉林长春130026
摘    要:根据东升水电站导流墙固结灌浆施工实践,总结了固结灌浆过程中钻孔、裂隙冲洗、压水试验、制浆、灌浆、封孔的原则和注意事项。对灌浆过程中所遇到的漏浆及串浆特殊情况,分别采取了待凝及塞住串浆孔的措施,并取得了较好的灌浆效果。

关 键 词:东升水电站  固结灌浆  漏浆  串浆
收稿时间:2012-04-07

Consolidation Grouting Construction Technology for Diversion Wall in Dongsheng Hydropower Station
LIU Wei-wei,JIANG Peng-fei,JI Xiao-yu,SUN You-hong and GAO Jing-xian. Consolidation Grouting Construction Technology for Diversion Wall in Dongsheng Hydropower Station[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2012, 39(9): 71-74
Authors:LIU Wei-wei  JIANG Peng-fei  JI Xiao-yu  SUN You-hong  GAO Jing-xian
Affiliation:College of Construction Engineering, Jilin University,College of Construction Engineering, Jilin University,College of Construction Engineering, Jilin University,College of Construction Engineering, Jilin University,College of Construction Engineering, Jilin University
Abstract:According to the consolidation grouting construction for diversion wall in Dongsheng hydropower station, the paper summarizes the principles and precautions of drilling, crack flushing, water pressure test, pulping, grouting and sealing in the process of consolidation grouting. Coagulation and string slurry plugging were taken to deal with slurry leakage and string slurry in the process of grouting construction with good grouting effect.
Keywords:dongsheng hydropower station  consolidation grouting  slurry leakage  string slurry
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《探矿工程(岩土钻掘工程)》浏览原始摘要信息
点击此处可从《探矿工程(岩土钻掘工程)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号