热电厂扩建工程脱硫工艺选择的初步探讨 |
| |
引用本文: | 郭新生,刘英萍,王璋.热电厂扩建工程脱硫工艺选择的初步探讨[J].山东电力技术,2005(5). |
| |
作者姓名: | 郭新生 刘英萍 王璋 |
| |
作者单位: | 山东烟台发电厂,山东,烟台,264002;山东烟台发电厂,山东,烟台,264002;山东烟台发电厂,山东,烟台,264002 |
| |
摘 要: | 简要介绍了循环流化床脱硫技术和几种烟气脱硫技术工艺的特点,结合电厂扩建工程的实际情况,对循环流化床锅炉脱硫和煤粉炉加半干法烟气脱硫技术方案进行了技术经济比较,对脱硫技术方案的选择给出了建议。
|
关 键 词: | 热电厂 循环流化床脱硫 烟气脱硫 工艺选择 |
Preliminary Discussion on the Selection of Desulphurisation Process for Expanding Construction Project of Thermal Power Plant |
| |
Abstract: | The desulphurisation characteristics of CFB and several FGD processes are briefly introduced.Technical and eco-nomical compare is given between the project of CFB desulphurisation and pulverized-coal-fired boiler plus damp-dry FGD process,and sugestions are given for the selection of desulphurisation process combinded with the specific conditions of ther-mal power plant expanding construction project. |
| |
Keywords: | heat and power plant CFB desulphurisation FGD process selection |