首页 | 本学科首页   官方微博 | 高级检索  
     

Study on new technique of rapidly following curtain filling
作者姓名:余健  张爱兰
作者单位:YU Jian 1,ZHANG Ai lan 21.College of Resources,Environment and Civil Engineering,Central South University,Changsha 410083,China; 2.School of Foreign Studies,Central South University,Changsha 410083,China
基金项目:TheKeyProgramof 9thFive YearPlanofChina(No .96 5 2 1 0 2 0 1)
摘    要:1 INTRODUCTIONIntherecentyearsthestudyofthefillingtechniquehadfocusedonhardenedmechanism ,microscopicpropertiesandlaterperiodstre

关 键 词:充填采矿法  连续开采  液压支柱  采矿方法
收稿时间:20 October 2001

Study on new technique of rapidly following curtain filling
Yu Jian,and Zhang Ai-lan.Study on new technique of rapidly following curtain filling[J].Journal of Central South University of Technology,2002,9(2):118-122.
Authors:Yu Jian  and Zhang Ai-lan
Affiliation:(1) College of Resources, Environment and Civil Engineering, Central South University, 410083 Changsha, China;(2) School of Foreign Studies, Central South University, 410083 Changsha, China
Abstract:The present problem of mining of narrow and gentle dip vein was analyzed. A new technique of rapidly following curtain filling was put forward. The results show that the new technique is feasible, has the characteristic to make the whole curtain wall filter, makes relative density of the filling tailings slurry reach saturation of 78.0% 80.0% in 25 min, and keeps the roof of mined out space stable in 60 min. The new technique of the rapidly following curtain filling has solved the difficult problem of the filling body filtering slowly and promptly controlling underground pressure, which cannot be solved in traditional ways.
Keywords:curtain filling  continuous mining  hydraulic prop  
本文献已被 CNKI 维普 万方数据 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号