云峰坝顶右岸侧向位移初期异常变位分析
引用本文:荆岫岩,李凤春.云峰坝顶右岸侧向位移初期异常变位分析[J].东北电力技术,2003,24(12):1-4.
作者姓名:荆岫岩  李凤春
作者单位:1. 辽宁电力科学研究院,辽宁,沈阳,110006
2. 云峰发电厂,吉林,集安,134200
摘    要:云峰坝顶右岸为陡坡地带,存在侧向稳定问题。在观测初期变形出现异常现象,通过调查研究,我们对此异常现象进行了分析。

关 键 词:侧向位移  异常  变位
文章编号:1004-7913(2003)12-0001-04
修稿时间:2003年8月14日

Analysis on Initial Abnormal Deformation on Right-sided Bank Lateral Displacement in Dam Top of Yunfeng Hydraulic Power Plant
JING Xiu-yan,LI Feng-chun.Analysis on Initial Abnormal Deformation on Right-sided Bank Lateral Displacement in Dam Top of Yunfeng Hydraulic Power Plant[J].Northeast Electric Power Technology,2003,24(12):1-4.
Authors:JING Xiu-yan  LI Feng-chun
Affiliation:JING Xiu-yan LI Feng-chun
Abstract:The right-side bank on dam top in Yunfeng is sloped,causing constant problems of lateral un-stability.In initial survey,abnormal phenomenon was observed,on which analysis is made through investigations.
Keywords:Lateral displacement  Abnormity  Deformation