State of the outlet works of the Sayano-Shushenskoe hydroelectric station and problems of their operation
Authors:Moroz  A. Ya.  Shatravskii  A. I.
Abstract:
1. The actual state of the outlet works as a whole can be evaluated as positive.
2. To provide complete readiness of the outlet works for service regimes and to keep them in good working order, it is necessary to seal the existing damages and subsequently to carry out annual scheduled preventive maintenance.
3. Long service of the restored bottom revetment of the stilling basin is possible under conditions of a moderate regime of waste discharges with their uniform distribution over the basin width, shortening of their duration, and reduction of the number of outlets put into operation.
4. The restored basin revetment is in need of careful observation of its condition and sealing.
5. The use of outlets for reducing the rate of filling the reservoir and especially for providing navigation releases is not permissible. They should be used only if the discharge capacity of the hydrostation units is insufficient for preventing filling of the reservoir during the spring flood above the elevation of the NPL as well as for not exceeding the NPL during passage of the summer-fall freshets with the reservoir filled to the NPL.
Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 4, pp. 9–12, April, 1994.