首页 | 本学科首页   官方微博 | 高级检索  
     

发电机定子B相接地故障分析及处理
引用本文:徐永盛.发电机定子B相接地故障分析及处理[J].水利电力机械,2009(3):48-51.
作者姓名:徐永盛
作者单位:四川华电西溪河水电开发有限公司,四川西昌615000
摘    要:介绍了紫兰坝电站^#2发电机主要技术参数和定子绕组基本概况。分析了定子B相接地故障产生的原因,论述了故障点查找方法、解决过程及解决办法,结合现场实际情况,提出了发电机定子绝维护的4措施。

关 键 词:发电机  定子B相接地故障  分析  检查方法  检查过程  防范措施

Analysis and handling of generator stator B-phase grounding faults
XU Yong-sheng.Analysis and handling of generator stator B-phase grounding faults[J].Water Conservancy & Electric Power Machinery,2009(3):48-51.
Authors:XU Yong-sheng
Affiliation:XU Yong-sheng ( Sichuan Huadian Xixihe Hydroelectric Development Corporation Limited, Xichang 615000, China)
Abstract:The main technical parameters and stator winding of generator No. 2 of Zilanba Hydropower Station were introduced. The reasons of stator B-phase grounding fault were analyzed. The method for locating the fault points, the resolving process and resolving method of the fault were discussed. Combining with field practical situation , four measures for generator stator maintenance were proposed.
Keywords:generator  stator B-phase grounding fault  analysis  inspection method  inspection process  precautionary measure
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号