深井煤矿顶管法施工管体承载力试验和工程应用
引用本文:刘子默,唐彬,黄志鸿,王传兵,张琪林,程松,陈旭之,孙长红.深井煤矿顶管法施工管体承载力试验和工程应用[J].煤矿安全,2022(2).
作者姓名:刘子默  唐彬  黄志鸿  王传兵  张琪林  程松  陈旭之  孙长红
作者单位:安徽理工大学土木建筑学院;安徽理工大学深部煤矿采动响应与灾害防控国家重点实验室;煤炭开采国家工程技术研究院;中安联合煤化有限责任公司
基金项目:国家自然科学基金资助项目(51804006);深部煤矿采动响应与灾害防控国家重点实验室自主课题资助项目(SKLMRDPC20ZZ04)。
摘    要:顶管法施工安全性高、掘进速度快、施工方便灵活,但若用于煤矿深部地层,则将面临地应力高、地质条件复杂等挑战。通过以张集煤矿顶管法掘进巷道为工程背景,开展顶管管体相似模型试验,揭示了管体承载机理,并根据试验结果确定管体设计参数。结合工程现场监测数据,总结施工经验:管体偏斜和浆液泄露是造成管体破坏的主要因素。在做好纠偏和密封工作的前提下,顶管法在煤矿瓦斯、水害治理巷道掘进工程中具有较大优势。

关 键 词:深井煤矿  顶管法  管体承载力  相似模型试验  现场监测  巷道掘进

Pipe bearing capacity test and engineering application of pipe jacking method in deep-buried coal mine
LIU Zimo,TANG Bin,HUANG Zhihong,WANG Chuanbing,ZHANG Qilin,CHENG Song,CHEN Xuzhi,SUN Changhong.Pipe bearing capacity test and engineering application of pipe jacking method in deep-buried coal mine[J].Safety in Coal Mines,2022(2).
Authors:LIU Zimo  TANG Bin  HUANG Zhihong  WANG Chuanbing  ZHANG Qilin  CHENG Song  CHEN Xuzhi  SUN Changhong
Affiliation:(School of Civil Engineering and Architecture,Anhui University of Science and Technology,Huaincin 232001,China;State Key Laboratory of Mining Response and Disaster Prevention and Control in Deep Coal Mines,Anhui University of Science and Technology,Huainart 232001,China;National Engineering Technology Research Institute of Coal Mining,Huainan 232001,China;Zhong’an United Coal Chemical Co.,Ltd.,Huainan 232001,China)
Abstract:The pipe jacking method has high construction safety, fast tunneling speed, convenient and flexible construction.However, if it is used in deep strata of coal mines, it will face challenges such as high ground stress and complex geological conditions. Taking the pipe jacking tunneling roadway in Zhangji Coal Mine as the engineering background, the similar model test of pipe jacking is carried out to reveal the bearing mechanism of pipe, and the design parameters of pipe are determined to the test results. Combined with the monitoring data of the construction site, the construction experience is summarized as follows: pipe deflection and slurry leakage are the main factors causing pipe damage. Under the premise of rectification and sealing work, the pipe jacking method has great advantages in coal mine gas and water disaster control roadway excavation engineering.
Keywords:deep coal mine  pipe jacking method  pipe bearing capacity  similar model test  field monitoring  roadway tunneling