首页 | 本学科首页   官方微博 | 高级检索  
     

TSP隧道超前地质预报技术及其3D成果研究与应用
引用本文:周黎明,邱东明,付代光,肖国强,王法刚.TSP隧道超前地质预报技术及其3D成果研究与应用[J].长江科学院院报,2016,33(10):72-78.
作者姓名:周黎明  邱东明  付代光  肖国强  王法刚
作者单位:1.长江科学院 水利部岩土力学与工程重点实验室,武汉 430010;2.中国水利水电第十四工程局有限公司 广东分公司,广州 510800
基金项目:国家自然科学基金青年基金项目(41202223);中央级公益性财政项目长江科学院院所基金(CKSF2013043/YT)
摘    要:水利水电洞室具有规模大、尺寸大的特点,如果开挖隧洞发育大型不良地质(断层破碎带、溶腔、突水突泥等),则更容易引发大型的安全生产事故,而水电隧洞超前地质预报工作相对薄弱,因此开展水电洞室超前地质工作是一种新的应用和研究。首先介绍了TSP技术的发展现状和基本原理,探讨了影响TSP数据采集的几点关键因素;之后,将TSP方法应用到乌东德水电站的泄洪洞和导流洞中,获得了大尺寸工作面水工洞室超前地质预报结果,并绘制出不良地质体3D空间分布成果。该结果与随后施工开挖揭露出的溶洞以及工作面前方存在的导流洞水体分布基本一致,验证了TSP技术在水电水利地下工程中应用的可行性和有效性,具有一定的应用推广意义。

关 键 词:TSP  隧道地质超前预报  3D成果  乌东德水电站  数据采集  
收稿时间:2016-02-13

Application of Technology of Advanced Tunnel Seismic Prediction and Its 3D Renderings
ZHOU Li-ming,QIU Dong-ming,FU Dai-guang,XIAO Guo-qiang,WANG Fa-gang.Application of Technology of Advanced Tunnel Seismic Prediction and Its 3D Renderings[J].Journal of Yangtze River Scientific Research Institute,2016,33(10):72-78.
Authors:ZHOU Li-ming  QIU Dong-ming  FU Dai-guang  XIAO Guo-qiang  WANG Fa-gang
Affiliation:1.Key Laboratory of Geotechnical Mechanics and Engineering of the Ministry of Water Resources,Yangtze River Scientific Research Institute,Wuhan 430010,China;2. Guangdong Branch,Sinohydro Bureau 14 Co. Ltd., Guangzhou 510800, China
Abstract:Large-scale safety accidents are prone to be triggered by large geological defectives (broken fault zone, cave, and water gushing and mud ) in large hydropower caverns.Advanced geological prediction for hydroelectric tunnel is relatively weak.In this research, the development status and basic principle of TSP (tunnel seismic pre-diction) technology are firstly introduced, and some key factors that affect TSP data acquisition are discussed .Fur-thermore, TSP technology is applied to the geological prediction for the discharge tunnels and diversion tunnels of Wudongde Hydropower Station.The geological prediction result of large working face is obtained , and the 3D spa-tial distribution of the geological defectives is given .The forecast results are basically in accordance with the excava -tion results which exposed karst caves and water distribution in front of excavation face .The prediction results verify the feasibility and effectiveness of the application of TSP technology in underground engineering of water conservan -cy and hydropower projects.
Keywords:TSP  advanced tunnel geological prediction  3D result  Wudongde hydropower station  data acquisi-tion
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《长江科学院院报》浏览原始摘要信息
点击此处可从《长江科学院院报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号