首页 | 本学科首页   官方微博 | 高级检索  
     

悬臂桩嵌固深度和桩前基岩阻滑宽度研究
引用本文:赵庆远. 悬臂桩嵌固深度和桩前基岩阻滑宽度研究[J]. 长江科学院院报, 2016, 33(10): 106-110. DOI: 10.11988/ckyyb.20150669
作者姓名:赵庆远
作者单位:辽宁省交通规划设计院有限责任公司, 沈阳 110166
摘    要:限于场地原因,需对悬臂桩桩前基岩超深开挖,且仅留有一定宽度的阻滑岩体,导致了阻滑岩体能否保证悬臂桩安全有效的问题。以岳阳滑坡悬臂桩桩前嵌固段岩体为研究对象,建立了桩前基岩的计算模型,探讨了不同嵌固深度下的安全阻滑宽度,并结合数据拟合方法建立了两者之间的函数关系。结果表明嵌固深度越大,安全阻滑宽度越小,两者之间呈幂函数关系,其关系式为hr=16.905 1B-0.754 0,并提出了岳阳滑坡最优的设计参数为嵌固深度6.24 m、阻滑宽度3.75 m。研究结果可为此类工程设计提供一定的理论指导和借鉴意义。

关 键 词:悬臂桩  桩前开挖  嵌固岩体  嵌固深度  桩前基岩阻滑宽度  
收稿时间:2015-08-10

Embedded Depth of Cantilever Pile and Width of Anti-slide Rock Mass in Front of Cantilever Pile
ZHAO Qing-yuan. Embedded Depth of Cantilever Pile and Width of Anti-slide Rock Mass in Front of Cantilever Pile[J]. Journal of Yangtze River Scientific Research Institute, 2016, 33(10): 106-110. DOI: 10.11988/ckyyb.20150669
Authors:ZHAO Qing-yuan
Affiliation:Liaoning Provincial Communication Planning & Design Institute, Shenyang 110166, China
Abstract:Due to spatial limitations, deep excavation of bedrock in front of cantilever pile is needed ; besides, a limited width of anti-slide rock is available, which leads to the problem whether the anti -slide rock could guarantee the safety of the cantilever pile.The safe width of anti-slide rock to ensure stability under different embedded depths are discussed through building a computational model of bedrock in front of the pile , and the functional relationship between the width of anti-slide rock and the embedded depth is established with data fitting method.The embedded rock in front of the cantilever pile of a landslide in Yueyang is taken as a case study .Results show that the greater the embedded depth, the smaller the needed width of anti -slide rock to ensure the stability, and they are in a power function relationship hr =16.905 1B-0.754 0 .Furthermore, the optimal design parameters of Yueyang landslide is :embedded depth 6.24 m, and width of anti-slide 3.75 m.The results could provide a theoretical guidance and refer -ence for such projects.
Keywords:cantilever pile  excavation in front of pile  embedded rock mass  embedded depth  width of anti-slide rock mass in front of cantilever pile
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《长江科学院院报》浏览原始摘要信息
点击此处可从《长江科学院院报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号