华能岳阳电厂 1~# 炉热控系统的改造与调试
引用本文:李选. 华能岳阳电厂 1~# 炉热控系统的改造与调试[J]. 电工标准与质量, 1998, 0(3)
作者姓名:李选
作者单位:华能岳阳电厂
摘    要:结合华能岳阳电厂1#炉热控系统优化试验过程,阐述对其给水控制系统、磨煤机组控制系统和通风控制系统所进行的一系列改进与调试.

关 键 词:给水控制  磨组控制  通风控制  改进与调试

The lmprovement and Adjustment of 1 # Boiler Heat ControlSystem of Huaneng Corp Yueyang Thermal Power Plant
Li Xuang. The lmprovement and Adjustment of 1 # Boiler Heat ControlSystem of Huaneng Corp Yueyang Thermal Power Plant[J]. Journal of Changsha University of Electric Power(Natural Science Edition), 1998, 0(3)
Authors:Li Xuang
Affiliation:Huaneng CorpYueyang Thermal Power Plant Yueyang 414002
Abstract:Connected with the optimization test process of 1 # boiler heat control system of Huaneng Corp Yueyang thermal power plant,a series of improvement and adjustment of the water supply control system,coal mill unit control system and ventilation control system of the boiler are discussed.
Keywords:Water control Coal mill unit control Ventilation control Improvement and adjustment  