首页 | 本学科首页   官方微博 | 高级检索  
     


A generic statistical methodology to predict the maximum pit depth of a localized corrosion process
Authors:A. Jarrah  M. Bigerelle  G. Guillemot  D. Najjar  A. Iost  J.-M. Nianga
Affiliation:aEquipe Mécanique des Structures, Hautes Etudes d’Ingénieur, 13 Rue de Toul, 59046 Lille Cedex, France;bArts et Métiers ParisTech – Centre de Lille, 8, Boulevard Louis XIV, 59000 Lille Cedex, France;cLaboratoire Roberval, UMR CNRS 6253, UTC Centre de Royallieu, BP 20529, 60205 Compiègne, France;dLaboratoire de Mécanique de Lille (LML), UMR CNRS 8107, PRES Université Lille Nord de France, F-59650 Villeneuve d’Ascq, France
Abstract:This paper outlines a new methodology to predict accurately the maximum pit depth related to a localized corrosion process. It combines two statistical methods: the Generalized Lambda Distribution (GLD), to determine a model of distribution fitting with the experimental frequency distribution of depths, and the Computer Based Bootstrap Method (CBBM), to generate simulated distributions equivalent to the experimental one. In comparison with conventionally established statistical methods that are restricted to the use of inferred distributions constrained by specific mathematical assumptions, the major advantage of the methodology presented in this paper is that both the GLD and the CBBM enable a statistical treatment of the experimental data without making any preconceived choice neither on the unknown theoretical parent underlying distribution of pit depth which characterizes the global corrosion phenomenon nor on the unknown associated theoretical extreme value distribution which characterizes the deepest pits.Considering an experimental distribution of depths of pits produced on an aluminium sample, estimations of maximum pit depth using a GLD model are compared to similar estimations based on usual Gumbel and Generalized Extreme Value (GEV) methods proposed in the corrosion engineering literature. The GLD approach is shown having smaller bias and dispersion in the estimation of the maximum pit depth than the Gumbel approach both for its realization and mean. This leads to comparing the GLD approach to the GEV one. The former is shown to be relevant and its advantages are discussed compared to previous methods.
Keywords:A. Aluminium   B. Modelling studies   C. Pitting corrosion
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号