Experience gained from making the incineration of solid domestic wastes a factory standard at thermal power stations in Russia
Authors:A. N. Tugov  V. F. Moskvichev  G. A. Ryabov  V. I. Ugnachev  A. N. Smirnov  Yu. V. Petrov
Affiliation:(1) All-Russia Thermal Engineering Institute (VTI), Avtozavodskaya ul. 14/23, Moscow, 115280, Russia;(2) GUP Ekotekhprom, ul. Bol’shaya Polyanka 42, Moscow, 109180, Russia;(3) ZiO, ul. Zheleznodorozhnaya 2, Moscow oblast, Podol’sk, 142103, Russia
Abstract:Using the results of activities on developing and adjusting the processes pertinent to thermal reprocessing of solid domestic wastes (SDWs), that were carried out by VTI specialists along with GUP Ekotekhprom specialists in 1999–2005, we selected operating conditions under which the power installations run in compliance with the requirements (adopted both in Russia and in the EU countries) imposed on the incineration of SDWs and purification of flue gases. It is indicated that ways are currently being considered of increasing the parameters of steam generated at SDW-fired power stations from the existing p = 1.2?1.4 MPa and t sup = 300?320°C to p = 4.0 MPa and t sup = 400°C to make the generation of electricity at them more efficient. Experience gained in this field by the boiler manufacturing plants in Russia is analyzed.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号