摘    要:为提高汛期水电消纳能力,本文在已有成本最小模型中引入弃水惩罚成本,建立了考虑弃水电量成本的短期电力电量平衡模型;针对模型求解过程中难以有效获取满足大规模复杂约束的可行解的不足,避免算法过早收敛和陷入局部最优,提出了基于滚动修正策略的改进粒子群算法.云南省滇中区域电网计算结果表明,相较于成本最小模型,虽然其他能源成本增加...

关 键 词:电力系统  短期电力电量平衡模型  弃水电量  粒子群优化算法  调峰

Short-term power balance model considering cost of abandoned hydropower
JI Changming,ZHAO Yawei,ZHANG Yanke,MA Haoyu.Short-term power balance model considering cost of abandoned hydropower[J].Journal of Hydroelectric Engineering,2021,40(3):50-63.
Authors:JI Changming  ZHAO Yawei  ZHANG Yanke  MA Haoyu
Affiliation:(College of Water Conservancy and Hydropower Engineering,North China Electric Power University,Beijing 102206)
Abstract:To raise the level of hydropower consumption during flood season,an objective of minimizing abandoned hydropower cost is added to the previous minimum cost model,and a short-term power balance model that takes this cost into account is developed for the power system.And an improved particle swarm optimization algorithm is formulated based on a rolling correction strategy to overcome the difficulty in obtaining effective feasible solutions satisfying large-scale complex constraints and to avoid premature convergence and local optimization.Calculations of the Dianzhong regional power grid in Yunnan Province shows that relative to the minimum cost model,although the cost of the other energy sources is increased by 1.42 million Yuan,the abandoned hydropower in flood season is decreased by 7.14 million kWh and the total system cost by 7.0%.Relative to the minimum abandoned hydropower model,although the abandoned hydropower is increased by 2.85 million kWh,the thermal power cost is decreased by 17.95 million yuan and the total system cost by 21.7%.In the period of peak regulation capacity lacking,a proper arrangement of the other power stations for peak regulation can effectively reduce the abandoned hydropower and total cost.
Keywords:power system  short-term power balance model  abandoned hydropower  particle swarm optimization algorithm  peak regulation