武乡和信电厂取水泵站进水渠石方控制爆破设计施工
引用本文:张吉成. 武乡和信电厂取水泵站进水渠石方控制爆破设计施工[J]. 山西水利科技, 2007, 0(1): 37-39
作者姓名:张吉成
作者单位:山西省水利建筑工程局,太原,030006
摘    要:通过对泵站工程地质、水文情况以及周围建筑物的分析,选择了经济合理的临时施工围堰填筑方案及合理的爆破开挖参数,采用了先进的施工工艺,取得了较好的效益。

关 键 词:和信电厂  泵站进水渠  控制爆破  设计施工
文章编号:1006-8139(2007)01-37-03
修稿时间:2006-11-15

Design and Construction of Excavating Stone Intake Canal by Controlled Blasting in Water Pumping Station of Hexin Power Station of Wuxiang County
ZHANG Ji-cheng. Design and Construction of Excavating Stone Intake Canal by Controlled Blasting in Water Pumping Station of Hexin Power Station of Wuxiang County[J]. Shanxi Hydrotechnics, 2007, 0(1): 37-39
Authors:ZHANG Ji-cheng
Affiliation:ZHANG Ji-cheng
Abstract:By means of analysis on engineering geological condition,hydrological status and situaion of neighour strcture,the economical and reasonable temporary plan to construct cofferdam,the reasonable parameters to blast stone of canal were selected.Due to adopt the advanced construction technique,the better benefit is obtained.
Keywords:Hexin Power Station intake canal of pumping station controlled blasting design and construction