首页 | 本学科首页   官方微博 | 高级检索  
     

公伯峡水电站离相封闭母线设计
引用本文:孙帆. 公伯峡水电站离相封闭母线设计[J]. 西北水电, 2005, 0(1): 66-69
作者姓名:孙帆
作者单位:中国水电顾问集团西北勘测设计研究院,西安,710065
摘    要:重点介绍了公伯峡水电站离相封闭母线绝缘水平和冷却方式的选择和确定,并对离相封闭母线的几个重点问题如结构特点、接地、与相关设备的连接、短路试验装置的设置等作了简单介绍。

关 键 词:公伯峡水电站 封闭母线 绝缘水平 结构 设备连接
文章编号:1006-2610(2005)01-0066-04
修稿时间:2004-11-29

Design of Isolated-phase Enclosed Bus for Gongboxia Hydropower Station
SUN Fan. Design of Isolated-phase Enclosed Bus for Gongboxia Hydropower Station[J]. Northwest Water Power, 2005, 0(1): 66-69
Authors:SUN Fan
Abstract:The selection and determination of isolation level of isolated-phase enclosed bus and cooling mode are introduced. Some key issues of isolated-phase enclosed bus, such as structural characteristics, earthing, connection with relevant equipment, and setting of short-circuit test device are also described.
Keywords:Gongboxia Hydropower Station  enclosed bus  insulation level  structure  equipment connection
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号