首页 | 本学科首页   官方微博 | 高级检索  
     

宝泉抽水蓄能电站浆砌石重力坝防渗面板分缝研究
引用本文:罗全胜,曹磊.宝泉抽水蓄能电站浆砌石重力坝防渗面板分缝研究[J].黄河水利职业技术学院学报,2008,20(4):1-3.
作者姓名:罗全胜  曹磊
作者单位:黄河水利职业技术学院,河南,开封,475004
摘    要:建立了宝泉抽水蓄能电站浆砌石重力坝坝体上游混凝土防渗面板分缝三维有限元计算模型.计算仅在温度荷载作用下,防渗面板不同分缝情况下的应力情况,得出防渗混凝土面板不同分缝宽度的合理性,为设计提供依据。

关 键 词:宝泉抽水蓄能电站  浆砌石重力坝  温差场  面板分缝  三维有限元

Research on Impervious Panel Joint in Cement-Rubble Gravity Dam of Baoquan Pumped-storage Power Station
LUO Quan-sheng,CAO Lei.Research on Impervious Panel Joint in Cement-Rubble Gravity Dam of Baoquan Pumped-storage Power Station[J].Journal of Yellow River Conservancy Technical Institute,2008,20(4):1-3.
Authors:LUO Quan-sheng  CAO Lei
Affiliation:(Yellow River Conservancy Technical Institute, Kaifeng 475001, Henan, China)
Abstract:This paper establishes three-dimension finite element calculation model of cement-rubble gravity dam on upstream concrete impervious panel joint.Under the action of only temperature loaded,stress distribution of impervious panel is calculated under different joint distance.Rationality of different joint width are calculated,which provides a reference for dam design.
Keywords:Baoquan pumped-storage power station  cement-rubble gravity dam  temperature field  panel joint  three-dimension finite element  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号