首页 | 本学科首页   官方微博 | 高级检索  
     

热轧U型钢板桩精轧过程金属流动行为的有限元分析
引用本文:刘升,张振兴,龚娜,洪玫,商贵芳,金巧.热轧U型钢板桩精轧过程金属流动行为的有限元分析[J].特殊钢,2013,34(5):1-4.
作者姓名:刘升  张振兴  龚娜  洪玫  商贵芳  金巧
作者单位:1. 武汉科技大学钢铁冶金及资源利用省部共建教育部重点实验室,武汉 430081 ; 2. 武汉钢铁集团公司港务公司,武汉 430082 ;
基金项目:武汉科技大学青年科技骨干培育计划资助基金
摘    要:针对热轧U型钢板桩(SY390BZ/%:0.23C、1.60Mn、0.44Si、0.18V,0.18Ti、0.05Nb)轧制过程中产生翘曲缺陷,采用有限元分析软件ABAQUS显式动力学算法,结合实验室试验测量参数,对钢板桩的精轧过程进行了仿真计算。在仿真计算的基础上,根据轧制平面内节点位移矢量分布情况,分析了轧件横向和纵向断面内金属流动规律。模拟结果显示轧件断面在孔型轧制的压下方向上存在零位移线,表明U型钢板桩轧制中坯料翼缘和锁口处在轧制压力方向上轧件内金属流动存在位移中性面,并伴有轧件锁口凸缘处金属流动过快,腹板处金属流动较慢而产生翘曲的现象。

关 键 词:U型钢板桩  SY390BZ钢  精轧  金属流动行为  有限元分析  
收稿时间:2013-03-25

Finite Element Analysis on Metal Flow Behavior of Hot Rolled U-Section Steel Sheet Pile during Finishing Rolling Process
Liu Sheng , Zhang Zhenxing , Gong Na , Hong Mei , Shang Guifang , Jin Qiao.Finite Element Analysis on Metal Flow Behavior of Hot Rolled U-Section Steel Sheet Pile during Finishing Rolling Process[J].Special Steel,2013,34(5):1-4.
Authors:Liu Sheng  Zhang Zhenxing  Gong Na  Hong Mei  Shang Guifang  Jin Qiao
Affiliation:1. Key Lab for Ferrous Metallurgy and Resources Utilization of Ministry of Education, Wuhan University of Science and Technology, Wuhan 430081 ; 2. Stevedoring Co, Wuhan Iron and Steel (Group) Corp, Wuhan 430082 ;
Abstract:According to the buckling defects of hot rolled U-section sheet pile ( steel SY390BZ /% : 0.23C, 1.60Mn, 0.44Si, 0.18V, 0.18Ti, 0.05Nb) formed during rolling process, the numerical-simulated calculation on finishing process of sheet pile has been carried out by using the dynamic-explicit-calculated method of finite element software ABAQUS and combined with experimental-measured parameters in lab. Based on simulation calculation, according to the distribution of node displacement vector on rolling plane, the rule of metal flow pattern of lateral and longitudinal section is analyzed. Simulation results show that there are zero displacement lines on work-piece section in pass reduction direction, it indicates there is a neutral flow plane for work piece metal flow in rolling force direction at flange and locker of U-section sheet pile work piece in rolling process, in company with fast flow of metal at locker flange and slow flow of metal at web of work piece thus to occur buckling phenomenon.
Keywords:U Section Steel Sheet Pile  Steel SY390BZ  Finishing Rolling  Metal Flow Behavior  Finite Element Analysis  
本文献已被 万方数据 等数据库收录!
点击此处可从《特殊钢》浏览原始摘要信息
点击此处可从《特殊钢》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号