首页 | 本学科首页   官方微博 | 高级检索  
     

1000MW机组石灰石-石膏湿法脱硫系统石灰石制浆方案比选
引用本文:崔箫.1000MW机组石灰石-石膏湿法脱硫系统石灰石制浆方案比选[J].电力建设,2009,30(4):68-70.
作者姓名:崔箫
作者单位:广东省电力设计研究院
摘    要:文章对石灰石-石膏湿法烟气脱硫装置中被广泛采用的湿磨制浆和石灰石粉制浆系统从设备、工艺流程、技术经济等方面进行了分析比较。针对1000 MW机组工程石灰石耗量较大的特点,从电厂长期运行角度出发,推荐采用技术成熟、运行经济的石灰石湿磨制浆方案。

关 键 词:石灰石-石膏湿法脱硫  1000MW机组  湿磨制浆  石灰石粉制浆

Comparison of Limestone Mortar Preparation Schemes for 1000 MW Unit Wet Limestone-gypsum FGD Systems
CUI Xiao.Comparison of Limestone Mortar Preparation Schemes for 1000 MW Unit Wet Limestone-gypsum FGD Systems[J].Electric Power Construction,2009,30(4):68-70.
Authors:CUI Xiao
Affiliation:Guangdong Electric Design Institute;Guangzhou 510600;China
Abstract:Analysis and comparisons of wet mill mortar preparation and limestone powder mortar preparation systems,which are widely used in wet limestone-gypsum FGD devices,are carried out from several aspects,such as equipment,process,technical,and economic,etc.According to the fact that 1 000 MW unit projects have large limestone consumption,technically matured and operation economical limestone wet mill scheme is recommended from long-term operation point of view.
Keywords:wet limestone-gypsum FGD  1 000 MW unit  wet mill mortar preparation  limestone powder mortar preparation  