漳泽发电厂Ⅱ期射水泵不上水原因分析及系统改进
引用本文:智小兵. 漳泽发电厂Ⅱ期射水泵不上水原因分析及系统改进[J]. 山西电力, 2004, 0(1): 37-38
作者姓名:智小兵
作者单位:山西漳泽电力股份有限公司检修分公司,山西,长治,046021
摘    要:着重对漳泽发电厂Ⅱ期射水泵不上水原因进行分析,并由此采取相应的改进措施,解决了长期存在的设备缺陷问题。

关 键 词:汽轮发电机组  凝汽器  射水泵  系统改进  漳泽发电厂
文章编号:1671-0320(2004)01-0037-02
修稿时间:2003-04-10

Reason Analysis of No Water Supply from Water Projecting Pump and Its System Improvement in Second Term of Zhangze Power Plant
ZHI Xiao-bing. Reason Analysis of No Water Supply from Water Projecting Pump and Its System Improvement in Second Term of Zhangze Power Plant[J]. Shanxi Electric Power, 2004, 0(1): 37-38
Authors:ZHI Xiao-bing
Abstract:It is mainly for the reason analysis phase in Zhangze Power Plant and also the relevant countermeasures adopted for this purpose which obviously raise the reliability of the equipment and finally the clear effect has been obtained.
Keywords:no water supply from the projecting pump  analysis  improvement  