首页 | 本学科首页   官方微博 | 高级检索  
     


Modeling and scheduling open shops with sequence-dependent setup times to minimize total completion time
Authors:Bahman Naderi  S. M. T. Fatemi Ghomi  M. Aminnayeri  M. Zandieh
Affiliation:1. Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran
2. Department of Industrial Management, Management and Accounting Faculty, Shahid Beheshti University, G. C., Tehran, Iran
Abstract:It is known that in many real industrial settings, some setup is carried out before the process of a job. Usually, the magnitude of this setup depends on the order of two consecutive jobs. In this case, the setup is called sequence-dependent. This paper deals with open shop scheduling with sequence-dependent setup times to minimize the total completion time. The problem is formulated as an effective mixed integer linear programming model that best characterizes and solves to optimality small-sized instances of the problem under consideration. Since the electromagnetism-like metaheuristic (EM) is successfully applied to some NP-hard problems, we have been motivated to employ and assess the effectiveness of EM to solve the open shop with setup times. To further enhance EM, a local search engine in form of a fast and simple simulated annealing is incorporated. In order to evaluate the performance of the proposed algorithms, an experiment is designed where the proposed methods are compared against some algorithms in the literature. The related results are analyzed by statistical tools. The experimental results and statistical analyses demonstrate that the proposed model and EM are effective for the problem.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号