Abstract: | The results of the application of asynchronized turbogenerators with vector control and biaxial excitation in the Russian electric power system are presented. Since 2003, five air-cooled asynchronized turbogenerators with powers of 110, 160, and 320 W have been in operation at heat electric power stations. The main results of their testing and operation are given. |