北京地铁某车站明挖基坑施工监测分析
引用本文:张明聚,由海亮,杜修力,王妍,张文宇.北京地铁某车站明挖基坑施工监测分析[J].北京工业大学学报,2006,32(10):874-878.
作者姓名:张明聚  由海亮  杜修力  王妍  张文宇
作者单位:北京工业大学,建筑工程学院,北京,100022;北京工业大学,建筑工程学院,北京,100022;北京工业大学,建筑工程学院,北京,100022;北京工业大学,建筑工程学院,北京,100022;北京工业大学,建筑工程学院,北京,100022
基金项目:北京市教育委员会科学技术与研究生教育建设项目资助(4700001401506).
摘    要:对北京地铁某车站明挖基坑施工跟踪监测,及时掌握基坑变形、支撑内力的变化动态,分析了施工过程中支护结构位移与内力的变化特征,并指导施工确保基坑稳定。测试表明:a)围护结构水平位移随工期的延续而增加,基坑开挖完成后逐渐趋于稳定,位移在第2道支撑处最大,围护结构底部位移较小;b)第1道钢支撑的轴力明显大于第2道和第3道支撑的轴力,c)在基坑阳角处斜钢支撑的轴力比其他位置钢支撑的轴力要大得多。

关 键 词:地铁车站  地下结构  施工  监测
文章编号:0254-0037(2006)10-0874-05
收稿时间:04 20 2006 12:00AM
修稿时间:2006年4月20日

Construction Monitoring Analysis for an Open Excavated Foundation-pit of a Subway Station in Beijing
ZHANG Ming-ju,YOU Hai-liang,DU Xiu-li,WANG Yan,ZHANG Wen-yu.Construction Monitoring Analysis for an Open Excavated Foundation-pit of a Subway Station in Beijing[J].Journal of Beijing Polytechnic University,2006,32(10):874-878.
Authors:ZHANG Ming-ju  YOU Hai-liang  DU Xiu-li  WANG Yan  ZHANG Wen-yu
Affiliation:College of Architecture and Civil Engineering, Beijing University of Technology, Beijing, 100022, China
Abstract:A field monitoring programme is carried out for the open-excavated project of a subway station in Beijing,the trends of the displacements and the inner forces are under control,and the change of characteris- tics of displacements and inner forces in the retaining structure during the construction is analyzed.The neces- sary engineering measurements are taken to keep the stability of the excavated foundation pit.There are sev- eral monitoring conclusions as follows:a)the horizontal displacements of retaining structure increase with the construction duration and tend to be ltable gradually after the foundation-pit excavation is completed,The largest displacement appears on the second layer steel support tube and the displacement is the smallest in the bottom of retaining structure;b)the axial forces on the first layer steel-support tube significantly greater than those of the second and the third layers;and c)the axial forces on the diagonal steel-support tubes in the out- side corner of the foundation-pit are much greater than those of the others.
Keywords:subway stations  underground structures  construction  monitoring