2008年广东电网输电线路冰灾受损情况及关键影响因素分析
引用本文:彭向阳,周华敏,潘春平. 2008年广东电网输电线路冰灾受损情况及关键影响因素分析[J]. 电网技术, 2009, 33(9): 108-112
作者姓名:彭向阳  周华敏  潘春平
作者单位:彭向阳,PENG Xiang-yang(广东省电力科学研究院,广东省,广州市,510600);周华敏,ZHOU Hua-min(广东电网公司,广东省,广州市,510600);潘春平,PAN Chun-ping(广东省电力设计研究院,广东省,广州市,510600)  
摘    要:介绍了2008年初广东电网线路设施冰灾受损、抢修复电情况,具体分析了输电线路杆塔受损、导(地)线断线、金具绝缘子掉串及通信光缆受损的形式和原因,研究了不同设计冰区、地形、海拔高程、塔型、杆塔受损类型、导(地)线受损类型、纵向荷载及垂直荷载等关键影响因素。提出输电线路防冰应采取差异化设计和重点加固原则,线路各组成部件强度应合理匹配,以最大限度地降低输电线路冰灾损失。

关 键 词:架空输电线路  冰冻灾害  覆冰故障  广东电网
收稿时间:2008-08-13

Damage Condition of Overhead Transmission Lines in Guangdong Power Grid Caused by Icing Disaster in 2008 and Analysis on Key Impacting Factors
PENG Xiang-yang,ZHOU Hua-min,PAN Chun-ping. Damage Condition of Overhead Transmission Lines in Guangdong Power Grid Caused by Icing Disaster in 2008 and Analysis on Key Impacting Factors[J]. Power System Technology, 2009, 33(9): 108-112
Authors:PENG Xiang-yang  ZHOU Hua-min  PAN Chun-ping
Affiliation:1.Guangdong Electric Power Research Institute;Guangzhou 510600;Guangdong Province;China;2.Guangdong Power Grid Corporation;3.Guangdong Electric Power Design & Research Institute;China
Abstract:Due to severe icing disaster in the beginning of the year 2008, the line facilities of Guangdong power grid sustained heavy losses. In this paper the damage condition of overhead transmission lines, the rush repair of damaged facilities and recovery of power supply are presented. The damage conditions and causations of facilities such as damage of transmission tower, breaking of conductors and ground wires, damage of fittings, breaking and falling of insulator strings, damage of communication optical fibers, are analyzed; the key impacting factors, such as the designed ice zone, landform, altitude elevation, tower types, tower damage types, damage types of conductors and ground wires, longitudinal load and vertical load and so on, are researched. Based on above-mentioned analysis and research, following recommendations are put forward: different de-icing measures and reinforcement of key components of transmission lines should be adopted, the intensity of composition parts for transmission line should be reasonably matched to decrease the damage of transmission lines caused by icing disaster as possible.
Keywords:overhead transmission line  icing disaster  ice-coating faults  Guangdong power grid