首页 | 本学科首页   官方微博 | 高级检索  
     

电梯井钢架高空拔杆法吊装
引用本文:李计刚,郭海兵,王余扬.电梯井钢架高空拔杆法吊装[J].山西建筑,2009,35(11):152-153.
作者姓名:李计刚  郭海兵  王余扬
作者单位:河南省第二建筑工程有限责任公司,河南郑州,450002
摘    要:对电梯钢井架吊装施工中涉及的主要构件拔杆和H型钢梁进行了受力分析,并进行了强度和稳定性验算,在满足要求的前提下,完整叙述了钢井架的施工过程,以期解决在缺少大型吊装机械设备的条件下,如何高空吊装钢结构井架的问题。

关 键 词:电梯钢架  杆件验算  独脚拔杆  吊装

The high-pull-pole method suspend using elevator well steel frame
LI Ji-gang,GUO Hai-bing,WANG Yu-yang.The high-pull-pole method suspend using elevator well steel frame[J].Shanxi Architecture,2009,35(11):152-153.
Authors:LI Ji-gang  GUO Hai-bing  WANG Yu-yang
Affiliation:LI Ji-gang, GUO Hai-bing ,WANG Yu-yang
Abstract:This paper analysis force of the main piece of pole and beams under construction and check to calculate strength and stabilities,while satisfy the premise of request,the integrity described the construction process,resolving under the condition of being in need of the large machine equipments,how hang well steel frame problem.
Keywords:elevator well stell frame  pole check computation  single pole  suspend  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号