CFG桩清泥处理时机选择研究邹艳萍(1979.),女,工程师
引用本文:杨帅,邹艳萍.CFG桩清泥处理时机选择研究邹艳萍(1979.),女,工程师[J].山西建筑,2011(33):142-143.
作者姓名:杨帅  邹艳萍
作者单位:中交三公局第一工程有限公司;
摘    要:以某高铁路基工程为例,针对CFG桩清泥处理时机选择进行了研究,结合管内泵压混合料灌注流程,分别阐述了钻泥清理方法选择和湿法机械清理钻泥时机选择,并指出了清理钻泥注意事项,以指导今后CFG桩施工。

关 键 词:CFG桩  施工方法  钻泥清理  时机选择

Research on timing choice for silt-cleaning treatment of CFG piles
YANG Shuai ZOU Yan-ping.Research on timing choice for silt-cleaning treatment of CFG piles[J].Shanxi Architecture,2011(33):142-143.
Authors:YANG Shuai ZOU Yan-ping
Affiliation:YANG Shuai ZOU Yan-ping
Abstract:Taking the foundation project of some express railway as the example,the paper researches the timing choice for silt-cleaning treatment of CFG piles,illustrates the cleaning method of drilling silt and the drilling timing choice for the wet mechanic silt cleaning by combining with the grouting procedure for the pumped and injected with grouting mixture,and points out the precautions for the silt-cleaning,so as to direct the future CFG pile construction.
Keywords:CFG pile  construction methods  drilling silt-cleaning  time choice  