预应力混凝土连续梁施工后残余徐变设计措施
引用本文:徐海军. 预应力混凝土连续梁施工后残余徐变设计措施[J]. 山西建筑, 2011, 37(30): 186-187
作者姓名:徐海军
作者单位:青岛市建筑设计研究院集团股份有限公司,山东青岛,266003
摘    要:通过分析预应力混凝土连续梁施工后的残余徐变的主要影响因素,从预测应力布置及梁体上下缘恒载,二期恒载施工时间,不同梁段施工周期,工后残余徐变预留调整4个方面提出了设计措施,并得出一些有现实指导意义的结论。

关 键 词:预应力混凝土  连续梁  残余徐变  设计措施

Residual creep design measures after prestressed concrete continuous beam construction
XU Hai-jun. Residual creep design measures after prestressed concrete continuous beam construction[J]. Shanxi Architecture, 2011, 37(30): 186-187
Authors:XU Hai-jun
Abstract:Through analyzing main factors influencing residual creep after prestressed concrete continuous beam construction,it proposes design measures from aspects of prestressed layout and beam up and down eternal loading,second-phase eternal loading construction duration,different beam section construction duration,and after-construction residual reservation adjustment,and obtains some modern guiding conclusions.
Keywords:prestressed concrete  continuous beam  residual creep  design measures  