唐河水电站面板坝主堆料填筑碾压参数的确定
引用本文:苏满红.唐河水电站面板坝主堆料填筑碾压参数的确定[J].山西建筑,2011,37(32):207-208.
作者姓名:苏满红
作者单位:山西省水利水电工程建设监理公司,山西太原,030002
摘    要:针对唐河水电站面板堆石坝填筑设计标准,分析了混凝土面板堆石坝布置与设计,通过现场碾压试验,取得了大坝填筑施工工艺及参数,从而为水电站大坝主堆石区填筑施工提供指导。

关 键 词:主堆石  碾压参数  施工工艺  水电站

On identification of filling and rolling parameter of main stacking at faced rockfill dam of Tanghe hydraulic power plant
SU Man-hong.On identification of filling and rolling parameter of main stacking at faced rockfill dam of Tanghe hydraulic power plant[J].Shanxi Architecture,2011,37(32):207-208.
Authors:SU Man-hong
Affiliation:SU Man-hong
Abstract:According to the design standard of the filling design of the faced rock-fill dam of Tanghe hydraulic power plant,the paper analyzes the allocation and design of the concrete faced rock-fill dam,according to the rolling test,achieves the construction craft and parameter of the dam's filling,so as to provide the direction for the filling construction of the main faced rock-fill dam of the hydraulic power plants.
Keywords:main stacking rock  rolling parameter  construction craft  hydraulic power plant  