首页 | 本学科首页   官方微博 | 高级检索  
     

多加工路径柔性作业调度方法
引用本文:夏禹,吴朋. 多加工路径柔性作业调度方法[J]. 仪器仪表学报, 2016, 37(6): 1433-1440
作者姓名:夏禹  吴朋
作者单位:重庆大学自动化学院重庆400030,1.重庆大学自动化学院重庆400030; 2. 重庆川仪自动化股份有限公司重庆400000
基金项目:国家2015年战略性新兴产业发展专项资金项目资助
摘    要:为了提高企业生产效率,降低生产成本,以仪器仪表制造业为背景,针对某企业流量计生产车间的特点,建立优化目标函数,提出了多加工路径柔性作业车间调度模型(MPFJSP)。为了避免该模型中非可行解的干扰,采用新的顺序编码方式和在非可行解周围搜索可行解并代替之的方法;且为提高收敛速度,将粒子分为若干小段分别更新和扰动,以保留优秀基因,由此形成分段多目标粒子群优化算法(PMOPSO)。通过算法对比,发现所提方法能在工件的每一条加工路径中寻优,验证了其性能更优越,也验证了MPFJSP相对于传统柔性作业车间调度(FJSP)更灵活,得到的解也更优,在流量计生产车间的实验性生产中,违约成本约下降了12%,生产效率提升约10%。

关 键 词:分段;仪器仪表;非可行解;多加工路径;柔性作业车间调度

Multi processing path flexible job scheduling method
Xia Yu and Wu Peng. Multi processing path flexible job scheduling method[J]. Chinese Journal of Scientific Instrument, 2016, 37(6): 1433-1440
Authors:Xia Yu and Wu Peng
Affiliation:School of Automation, Chongqing University, Chongqing 400030, China and 1. School of Automation, Chongqing University, Chongqing 400030, China; 2. Chongqing Chuanyi Automation Co., Ltd. Chongqing 400000, China
Abstract:In order to improve the production efficiency and reduce the production cost, in this paper, taking instrument and meter manufacturing industry as the background, aiming at the characteristics of a certain flow meter production workshop, we establish the optimization objective function, propose a multi processing path FJSP (MPFJSP) model. In order to avoid the interference of the non feasible solutions in the model, we adopt a new sequential encoding mode and a new method that searches the feasible solution nearby the non feasible solution and then replaces the non feasible solution. In order to improve the convergence speed, the particles are divided into a number of small segments, which are updated and disturbed respectively, and the excellent gene is reserved; thus, the PMOPSO algorithm is formed. Compared with other algorithms, the proposed algorithm could find the optimum machining path in every machining path of the workpiece, which verifies the superior performance of the algorithm; it is also verifies that the MPFJSP is more flexible than traditional FJSP, and the obtained solution is better. In the experimental production of the flow meter production workshop, the default cost is decreased by about 12%, and the production efficiency is improved by about 10%.
Keywords:piecewise   instrument and meter   non viable solution   multi processing path   flexible job shop scheduling problem(FJSP)
本文献已被 CNKI 等数据库收录!
点击此处可从《仪器仪表学报》浏览原始摘要信息
点击此处可从《仪器仪表学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号