青松水电站首部枢纽水工泥沙模型试验
引用本文:尹宏伟,王新宏,张宗孝,杨洪艳. 青松水电站首部枢纽水工泥沙模型试验[J]. 电网与清洁能源, 2008, 24(5): 69-71
作者姓名:尹宏伟  王新宏  张宗孝  杨洪艳
作者单位:西安理工大学;西安理工大学;西安理工大学;西安理工大学
摘    要:通过泥沙模型试验,研究了不同入库水沙条件下进入取水口内水流的含沙量和颗粒级配,通过合理控制水库泥沙淤积和水库泄空冲沙,可保证设计所需长期有效的日调节库容。通过试验表明以水库代替沉沙池是可行的。

关 键 词:模型试验;泥沙;库容;青松水电站

Experiment Investigation on Sediment Model for Qingsong
YIN Hong-wei,WANG Xin-hong,ZHANG Zong-xiao and YANG Hong-yan. Experiment Investigation on Sediment Model for Qingsong[J]. Power system and clean energy, 2008, 24(5): 69-71
Authors:YIN Hong-wei  WANG Xin-hong  ZHANG Zong-xiao  YANG Hong-yan
Abstract:By the experiment of sediment model test, the sediment content and size grading under the different conditions of inflowing sediment was analyzed. The long-term available regulation storage required by design can be ensured by rationally controlling sediment in reservoir and scouring sediment from reservoir. It was shown by model test that the reservoir can be replacing the sedimentation basin.
Keywords:model experiment   sediment   capacity of reservoir   Qingsong hydropower station