Abstract: | During pouring the concrete roof of worm wheel No.1 set, the poured concrete was sunken, cracks occurred at the surface of storehouse, and construction was interrupted. The cause of the accident was analyzed, the measures of excavating slot for backfill expansive concrete, chemical grouting and consolidating structures were taken. It was shown by inspect data that the local quality of construction up to par of design and national standard. |