首页 | 本学科首页   官方微博 | 高级检索  
     

330 kV与220 kV电磁环网解环研究
作者姓名:张艳霞  范雪峰
作者单位:甘肃光明电力工程咨询监理有限公司,甘肃省电力公司
摘    要:随着白银750 kV送变电工程的建设,白银地区750 kV、330 kV、220 kV多级电磁环网出现,这给电力生产的安全运行带来隐患。主要结合西北电网750 kV主网发展及白靖220 kV和330 kV电网的结构变化,对相应各阶段的电磁环网解环影响因素进行了详细分析论证,提出可行的方案和解决问题的措施,通过技术经济比较,给出适合电网发展、解开电磁环网的合理的方案。

关 键 词:电磁环网  解环  分析

Research on Breaking Mode of 330 kV and 220 kV
Authors:ZHANG Yan-xia and FAN Xue-feng
Affiliation:Gansu Bright Consultation and supervision,Gansu Electric Power Corporation
Abstract:Along with the completion and put into service of Baiyin 750 kV project, multilevel electromagnetic loop circuits of 750 kV, 330 kV and 220 kV have been existed in Baiyin that may be not propitious for security and stability of power system. According to the network planning of Northwest China Power Grid and structure change of Baiyin 330 kV and 220 kV network, main facts of breaking mode of electro-magnetic loop circuits correspond to every stage has been studied and feasible proposal and solution has been proposed in this paper. On the basis of cost-effectiveness analysis, some reasonable proposal has been put forward for breaking the electro-magnetic loop circuits and the expansion of power grid.
Keywords:
点击此处可从《》浏览原始摘要信息
点击此处可从《》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号