Abstract: | A fuzzy set based cost model for additive manufacturing is proposed. The model is illustrated through an example of selective laser sintering (SLS), a commonly used additive manufacturing (AM) process. Initially, a deterministic cost model is developed. It is then converted to a fuzzy set based model by considering uncertainty in build time estimation and cost components. For the specific case of SLS, a build time estimation procedure is developed as a part of the cost model. A method to evaluate the reliability of the cost estimate in AM and its significance is also introduced. The cost model is illustrated through two examples of products manufactured by SLS. |