首页 | 本学科首页   官方微博 | 高级检索  
     

池潭大坝安全监测系统现状及更新改造设想
引用本文:张扬.池潭大坝安全监测系统现状及更新改造设想[J].水电自动化与大坝监测,2000,24(1):16-18.
作者姓名:张扬
作者单位:池潭水电厂,福建泰宁,354400
摘    要:池潭大坝建于 80年代初 ,近期运行中发现大坝渗流及变形等方面存在一些疑点 ,但其原有的监测系统已不能满足对大坝安全进行及时有效的监视以及电厂减人增效的现代化管理要求。文章介绍了池潭大坝原安全监测系统的构成 ,分析了其存在的主要问题及成因 ,并提出实施自动化更新改造的原则及思路

关 键 词:池潭  安全监测  更新改造  自动化

PRESENT STATE AND REFORMATION PLAN OF CHITAN DAM SAFETY MONITORING SYSTEM
Zhang Yang.PRESENT STATE AND REFORMATION PLAN OF CHITAN DAM SAFETY MONITORING SYSTEM[J].HYDROPOWER AUTOMATION AND DAM MONITORING,2000,24(1):16-18.
Authors:Zhang Yang
Abstract:The Chitan dam was built in the early 1980s. Some hidden defects in the aspects of dam foundation seepage and dam deformation were found in recent years. However, the present state of the safety monitoring system connot meet the needs of effective monitoring of the dam safety and the needs of modern management of the power plant. The paper introduces the components of the old safety monitoring system,analyses the existing problems and their causes, and the principle for reformation,which will be useful for other similar projects.
Keywords:safety monitoring  renewal and reformation  automation  
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《水电自动化与大坝监测》浏览原始摘要信息
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号