大岗山水电站前期勘测设计中的大坝抗震研究
引用本文:段斌,陈刚,严锦江,黄彦昆. 大岗山水电站前期勘测设计中的大坝抗震研究[J]. 水利水电技术, 2012, 43(1): 61-64,68
作者姓名:段斌  陈刚  严锦江  黄彦昆
作者单位:(1.国电大渡河流域水电开发有限公司,四川成都610041; 2.四川大学水利水电学院,四川成都610065; 3.中国水电顾问集团成都勘测设计研究院,四川成都610072)
摘    要:大岗山水电站坝址区设计地震峰值加速度达到557.5 cm/s2,大岗山拱坝的最大坝高达210 m,其地震动响应规律复杂,通过前期勘测设计阶段系统、全面的研究,抗震方面存在的有关问题在可行性研究阶段已基本明确,采取的相应工程措施满足可行性研究阶段工程抗震的要求,大岗山拱坝的抗震安全性能够得到保证。

关 键 词:大岗山水电站  大坝  抗震  
收稿时间:2011-04-20

Seismic study on dam of Dagangshan Hydropower Station in early-stage investigation and design
DUAN Bin , CHEN Gang , YAN Jinjiang , HUANG Yankun. Seismic study on dam of Dagangshan Hydropower Station in early-stage investigation and design[J]. Water Resources and Hydropower Engineering, 2012, 43(1): 61-64,68
Authors:DUAN Bin    CHEN Gang    YAN Jinjiang    HUANG Yankun
Affiliation:(1. Dadu River Hydropower Development Co. Ltd.,Chengdu 610041,Sichuan, China; 2. College of Water Resource and Hydropower, Sichuan University, Chengdu 610065,Sichuan, China; 3. Hydmchina Chengdu Engineering Corporation, Chengdu 610072, Sichuan, China)
Abstract:The design peak seismic acceleration within the site area of Dagangshan Hydropower Station is to reach 557.5 cm/s2 with a complicated law of seismic dynamic response,moreover,the maximum height of the arch dam for the hydropower station is to be 210 m.Therefore,a systematic and comprehensive seismic study on the dam is just made during the phase of the early-stage investigation and design for the project,and then,the related seismic problems are clarified and the relevant engineering countermeasures to be adopted therein can meet the seismic requirements for the feasibility study concerned as well.Therefore,the seismic safety of the arch dam for Dagangshan Hydropower Station can be surely guaranteed.
Keywords:Dagangshan Hydropower Station  dam construction  seismic design