首页 | 本学科首页   官方微博 | 高级检索  
     

某特大跨斜拉桥施工阶段主梁受力分析
引用本文:王建新.某特大跨斜拉桥施工阶段主梁受力分析[J].山西建筑,2010,36(16):328-329.
作者姓名:王建新
作者单位:浙江广厦建设职业技术学院建工分院,浙江,东阳,322100
摘    要:通过有限元软件对某436 m跨径的宽桥面双塔双索面钢—混结合梁斜拉桥施工阶段的结构受力进行了分析,计算结果表明,在双悬臂施工阶段、单悬臂施工阶段以及安装桥面系阶段,桥梁的混凝土面板和钢主梁应力均满足规范要求,说明该桥施工阶段主梁安全可靠。

关 键 词:结合梁  斜拉桥  施工阶段  有限元

Girder stress analysis in the construction stage of one large span cable-stayed bridge
WANG Jian-xin.Girder stress analysis in the construction stage of one large span cable-stayed bridge[J].Shanxi Architecture,2010,36(16):328-329.
Authors:WANG Jian-xin
Affiliation:WANG Jian-xin
Abstract:By finite element software,the thesis made a structure stress analysis in construction stage to one twin-tower and steel cable-stayed bridge with a 436 metre span-diameter bridge surface.The result of the calculation showed the tensions of the concrete plane and steel girder meet the standard requirements in double-cantilever construction stage,single-cantilever construction stage and the bridge-floor system installation stage,which indicated the girder of this bridge is safe and reliable.
Keywords:comprehensive girder  cable-stayed bridge  construction stage  finite element
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号