首页 | 本学科首页   官方微博 | 高级检索  
     

海心沙2#桥水上钢桥钢箱梁分段分块吊装施工
引用本文:刘斯琴,何登甲,吴锦伟.海心沙2#桥水上钢桥钢箱梁分段分块吊装施工[J].广东土木与建筑,2011(12):33-35,28.
作者姓名:刘斯琴  何登甲  吴锦伟
作者单位:广州机施建设集团有限公司技术研发中心
摘    要:介绍海心沙2#桥蝴蝶型人行桥项目大宽度钢箱梁分段、分块吊装施工技术,并给出了整个吊装过程中的质量控制标准,为同类型工程项目施工提供一定的参考意见.

关 键 词:钢箱梁  分段  分块  吊装

Segamatation and Block lifting Construction of the Steel Box Gider of the No.2 Water Bridge in Haixinsha Island
Liu Siqin He Dengjia Wu Jinwei.Segamatation and Block lifting Construction of the Steel Box Gider of the No.2 Water Bridge in Haixinsha Island[J].Guangdong Architecture Civil Engineering,2011(12):33-35,28.
Authors:Liu Siqin He Dengjia Wu Jinwei
Affiliation:Liu Siqin He Dengjia Wu Jinwei(Technology Research Centre of Guangzhou Jishi Construction Group Co.,Ltd.Guangzhou 510150,China)
Abstract:In this paper,the segamatation and block liftiing construction of the large width steel box girder of the No.2 water bridge which is a butterfly-shape pedestrian bridge is discussed.The quality control standard of the whole lifting is given,those are reference for the future similar engineering.
Keywords:steel box girder  segamatation  block  lifting
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号