公伯峡水电站溢洪道坝料开采爆破控制
引用本文:徐云杉.公伯峡水电站溢洪道坝料开采爆破控制[J].长江科学院院报,2003,20(Z1):35-37.
作者姓名:徐云杉
作者单位:中国水利水电第三工程局公伯峡施工局,陕西,西安,710016
摘    要:公伯峡水电站溢洪道工程地质条件复杂.该水电站在坝料开采中经过爆破试验确定了坝料爆破参数,并在坝料开采过程中以精湛的施工工艺、科学的现场管理,既获得了优良的建基面,保证了高边坡的稳定和齐整,同时也获得了优质的坝料,使爆破作业得到了较好的控制.

关 键 词:溢洪道  坝料开采  爆破试验  现场控制
文章编号:1001-5485(2003)S1-0035-03
修稿时间:2003年9月30日

Controlled quarry blasting for dam-filling materials in spillway at Gongbo Gorge Hydropower Station
XU Yun-shan.Controlled quarry blasting for dam-filling materials in spillway at Gongbo Gorge Hydropower Station[J].Journal of Yangtze River Scientific Research Institute,2003,20(Z1):35-37.
Authors:XU Yun-shan
Abstract:The geological condition of the spillway at Gongbo Gorge Hydropower Station was very complicated. During the excavation of the dam-filling materials, the adopted blasting parameters were based on field experiment. With skilled construction technology, foundation with good qualify was excavated, the stability and smoothness of high slope were ensured, and at the same time, dam-filling with good grading was obtained. The whole process of blasting was under good control.
Keywords:spillway  excavation of dam-filling materials  blasting experiment  site control  