首页 | 本学科首页   官方微博 | 高级检索  
     


Optimal Repetitive Scheduling Model with Shareable Resource Constraint
Authors:Sou-Sen Leu  Shao-Ting Hwang
Affiliation:11Assoc. Prof., Dept. of Constr. Engrg., Nat. Taiwan Univ. of Sci. and Technol., P.O. Box 90-130, Taipei, Taiwan 10672, Republic of China.
22Master, Dept. of Constr. Engrg., Nat. Taiwan Univ. of Sci. and Technol., P.O. Box 90-130, Taipei, Taiwan 10672, Republic of China.
Abstract:An optimal repetitive scheduling model for precast production with the consideration of resource constraints and resource sharing is proposed in this paper. A repetitive schedule, like precast production, needs to take into consideration the impact of limited resources, including equipment (such as cranes, forms, and steaming curing facilities) and skilled labor, on production makespan. Moreover, to economically and effectively utilize these valuable resources (such as cranes and work crews), it is worth taking resource sharing into consideration in precast production. A genetic algorithm-based searching technique is adopted to establish an optimal resource-constrained repetitive precast production scheduling system with the consideration of resource sharing. The system can effectively provide the optimal or near-optimal combination of production durations, resource amounts, and minimum makespan under the constraint of limited resources and with the consideration of resource sharing.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号