首页 | 本学科首页   官方微博 | 高级检索  
     


Time-Overrun Factors in Nigerian Construction Industry
Authors:Augustine Uche Elinwa  Mangvwat Joshua
Affiliation:11Assoc. Prof., Civ. Engrg. Programme, Abubakar Tafawa Balewa Univ., P.M.B. 0248, Bauchi, Nigeria.
22Grad. Student, Quantity Surv. Programme, Abubakar Tafawa Balewa Univ., P.M.B. 0248, Bauchi, Nigeria.
Abstract:Factors that affect time overrun in the Nigerian construction industry have been studied, and the rank agreement factor for the professionals are architects∕engineers, 0.75; architects∕builders, 0.83; quantity surveyors∕engineers, 0.74; quantity surveyors∕builders, 0.79; and engineers∕builders, 0.69. Important findings are (1) the degree of occurrence of time overrun is high—between 80 and 90%; (2) relative contributions of the client, contractor, and others are 62, 32, and 6%, respectively; (3) time overrun is more pronounced in government/public sector projects (89%); and (4) time overrun occurs on all projects, irrespective of size.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号