首页 | 本学科首页   官方微博 | 高级检索  
     

姚河坝水电站工程的重大地质变化及处理措施
引用本文:陈建春.姚河坝水电站工程的重大地质变化及处理措施[J].四川水力发电,2001,20(3):9-12.
作者姓名:陈建春
作者单位:四川南桠河流域水电开发有限责任公司
摘    要:介绍姚河坝水电站由于前期的地质勘探工作深度不够,在厂房后边坡、调压井和引水隧洞下段的施工过程中地质条件所发生的重大变化及具体处理措施,通过分析对工程投资和工期的影响,总结了其中的经验和教训。

关 键 词:姚河坝水电站  地质变化  处理措施  地质勘探深度  后边坡  调压井  引水隧洞  工程投资  工期
文章编号:1001-2184(2001)03-0009-04

Great Change in Geological Conditions at Yaoheba Hydropower Station and The Countermeasures
CHEN Jian,chun.Great Change in Geological Conditions at Yaoheba Hydropower Station and The Countermeasures[J].Sichuan Water Power,2001,20(3):9-12.
Authors:CHEN Jian  chun
Abstract:According to Owner Responsibility System practised during construction management of Yaoheba Hydropower Station , management for hydropower construction organization is introduced , the leading role of the Owner in construction management is analyzed systematically , and experience in management during construction of Yaoheba Hydropower Station is given to provide reference .
Keywords:construction of hydropower station  Owner Responsibility System  practice  experience
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号