首页 | 本学科首页   官方微博 | 高级检索  
     


Cyclic Assembly Schedules
Authors:John O. McClain   William W. Trigeiro
Affiliation: a Cornell University Graduate School of Management, Ithaca, NY
Abstract:Cyclic assembly schedules are schedules which follow a repeating production pattern. Each component is produced at times that are integer multiples of the base planning period of the finished product. These schedules have the managerial advantages of ease of control and planning, since future production follows a familiar, repeating pattern. Establishing and maintaining such a schedule requires a system to protect the schedule when bottlenecks occur. This paper discusses some of these issues and describes a simple method for calculating the optimal parameters of a cyclic schedule in a multistage assembly operation when production intervals are power-of-two multiples of a base period specified by management. The cycles are based on an Economic Order Quantity analysis, which is applicable if demand for the end items is fairly steady as in the case of a facility that supplies components to an assembly line.
Keywords:
本文献已被 InformaWorld 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号