薄壁高墩连续梁移动模架法设计与施工
引用本文:刘旭峰.薄壁高墩连续梁移动模架法设计与施工[J].山西建筑,2007,33(19):131-132.
作者姓名:刘旭峰
作者单位:中铁十九局集团公司第一工程有限公司,辽宁 辽阳 111000
摘    要:介绍了扬中夹江二桥引桥40 m跨等高预应力混凝土连续梁的设计与施工情况,重点介绍了移动模架造桥机在薄壁高墩连续梁结构中的成功应用,指出该工程使用的移动模架造桥机具有承载力大、滑移方便等优点,确保了施工进度,值得推广应用。

关 键 词:40m连续梁  移动模架造桥机  施工方法  设计参数
文章编号:1009-6825(2007)19-0131-02
修稿时间:2007-02-05

Design and construction of thin-wall high pier continuous beams with movable framework
LIU Xu-feng.Design and construction of thin-wall high pier continuous beams with movable framework[J].Shanxi Architecture,2007,33(19):131-132.
Authors:LIU Xu-feng
Affiliation:LIU Xu-feng
Abstract:Design and construction situations of continuous prestressed concrete beam with 40 m span in approach works of the second bridge of Yangzhongjia River are introduced. The successful application of movable framework system in construction of thin-wall high pier continuous beams is mainly introduced. Author points out that movable framework system has so many advantages , which is worthy of being popularized.
Keywords:40 m continuous beam  construction method  movable framework system  design parameter