首页 | 本学科首页   官方微博 | 高级检索  
     

超前地质预报在圆梁山隧道施工中的应用
引用本文:李诚明. 超前地质预报在圆梁山隧道施工中的应用[J]. 山西建筑, 2009, 35(15): 297-299
作者姓名:李诚明
作者单位:中铁隧道集团二处有限公司,河北,三河,065201
摘    要:以渝怀铁路圆梁山隧道施工为例,归纳了隧道超前地质预报的目的和手段,介绍了圆梁山隧道的综合超前地质预报计划及实施情况,从而进一步认识到复杂地质条件下综合超前地质预报的重要性。

关 键 词:隧道  超前地质预报  施工  实施情况

Application of geological forecast on the tunnel construction of Yuanliang mountain
LI Cheng-ming. Application of geological forecast on the tunnel construction of Yuanliang mountain[J]. Shanxi Architecture, 2009, 35(15): 297-299
Authors:LI Cheng-ming
Affiliation:LI Cheng-ming
Abstract:Taking the tunnel construction of Yuanliang mountain on Yuhuai railway as example,the author concludes the aim and ways of the tunnel geological forecast,introduces the comprehensive geological forecast plan and implementation situation of the tunnel in Yuanliang mountain,thus recognizing the importance of geological forecast in the complicated geological condition.
Keywords:tunnel  geological forecast  construction  implementation situation  