首页 | 本学科首页   官方微博 | 高级检索  
     


Rebuilding of three-phase load voltage during single-phase auto reclosing in medium voltage distribution lines
Affiliation:1. Department of Electrical Technology, Faculty of Technology and Education, Helwan University, Cairo, Egypt;2. Professor of Power System Protection, Cairo, Egypt
Abstract:Most faults in medium voltage (MV) distribution lines are temporary single line to ground (LG) faults. Single-phase auto reclosing (SPAR) may be used to remove the LG fault producing highly unbalanced and low voltage across the load during the reclosure dead time. The negative sequence voltage produced may cause severe over heating in three-phase induction motors. It is proposed to connect a zigzag winding grounding transformer at the remotest load bus to rebuild the three-phase voltage during the SPAR dead time. The zigzag transformer neutral should remain disconnected from the ground during normal operation.
Keywords:Distribution line  Auto reclosing  Reclosure dead time  Negative sequence voltage  Zigzag transformer
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号