首页 | 本学科首页   官方微博 | 高级检索  
     


Optimal Planning and Scheduling for Repetitive Construction Projects
Authors:Khalied Hyari  Khaled El-Rayes
Affiliation:1Assistant Professor, Dept. of Civil Engineering, The Hashemite Univ., P.O. Box 150459, Zarqa 13115, Jordan. E-mail: hyari@hu.edu.jo
2Assistant Professor, Dept. of Civil and Environmental Engineering, Univ. of Illinois at Urbana-Champaign, Urbana, IL 61801 (corresponding author). E-mail: elrayes@uiuc.edu
Abstract:This paper presents a multiobjective optimization model for the planning and scheduling of repetitive construction projects. The model enables construction planners to generate and evaluate optimal construction plans that minimize project duration and maximize crew work continuity, simultaneously. The computations in the present model are organized in three major modules: scheduling, optimization, and ranking modules. First, the scheduling module uses a resource-driven scheduling algorithm to develop practical schedules for repetitive construction projects. Second, the optimization module utilizes multiobjective genetic algorithms to search for and identify feasible construction plans that establish optimal tradeoffs between project duration and crew work continuity. Third, the ranking module uses multiattribute utility theory to rank the generated plans in order to facilitate the selection and execution of the best overall plan for the project being considered. An application example is analyzed to illustrate the use of the model demonstrate its new capabilities in optimizing the planning and scheduling of repetitive construction projects.
Keywords:Road construction  Highway construction  Scheduling  Resource management  Optimization  Evolutionary computation  Computer models  Construction management  
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号